CIMIC Group company CPB Contractors were selected to deliver the $3.9 billion WestConnex M4-M5 Link Rozelle Interchange in a 50:50 joint venture with John Holland.
The WestConnex M4-M5 Link Rozelle Interchange will connect the extended M4 and the New M5 to the Anzac Bridge and Victoria Rd. It will also provide for a connection to the proposed Western Harbour Tunnel and Beaches Link project.
Global are delivering works throughout multiple stages of the project with Construction to conclude in 2023.
Client – CPB Contractors / John Holland JV
Global Utility construction has delivered.
- Installation of over 100 new LED street lights including foundations, Conduit, Pits, Cabling & termination.
- Installation of over 3kms of ITS Conduit systems including pits.
- Installation of temporary systems including light, power, and communications networks.
Global Utility Construction is still on-site at Rozelle. To keep up with project progress please visit our LinkedIn