Fibre Repair and Maintenance – UECOMM

Fibre Repair and Maintenance – UECOMM

GlobalUC were engaged by UECOMM to repair a Cable that had been damaged/hit in Sydney CBD. Our dedicated team ; Were onsite within 90 minutes. Hauled a temporary cable. Created a temporary joint & Prepped temporary cable into existing joint. GlobalUC had the...
Blown Fibre – Sydney CBD

Blown Fibre – Sydney CBD

Globaluc were engaged by a new customer to complete blown Fibre works within Sydney CBD Scope of works completed; Run 1Di cable from existing backbone to customer rack Cut into backbone and connected 1Di to IT. Blew Fibre down from customer rack to existing customer...
Upgrade at  Schofields – Aarnet

Upgrade at Schofields – Aarnet

Globaluc was engaged by Aarnet to complete fibre cutover works. Scope of works included; Cutover from an old 216F to a 312F cable. We bare Fibre tested the 312F cable. Supplied and installed new TYCO-FISTBE6 joints. Cut out old 216F and installed 312F into new joints....
Railway Terrace | Schofields | AARnet

Railway Terrace | Schofields | AARnet

GUC were engaged by AARnet for this Relocation Project. With the construction of a new shopping centre in the area, all utilities were needed to be relocated. We used our Vermeer 36-50 to deliver the relocation of the Telco Fibres. Project Comprised of; P50mm conduit...
Taree to Foster – Optus

Taree to Foster – Optus

GUC Communications team delivered communications infrastructure project across the Manning River in Taree. The challenging Sub-marine cable installation required barges, cranes, and divers Drills and the highly experiences GUC team. We competed two HDD shots either...