Sydney Harbour Bridge

Posted by: Team GUC

August 25, 2020

GUC Installed Communications and Electrical infrastructure on behalf of a Communications carrier to numerous locations in Dawes Point and around the Sydney Harbour Bridge.

The Vermeer D40 x 55 HDD used was perfect for any hard rock encountered Using a Horizontal Directional drill kept the project clean and safe while leaving little damage to the surface.

The project entailed the following

  • 145m of Communications Pits and Infrastructure around the Harbour Bridge
  • 205m of Electrical Pits and Infrastructure around the Harbour Bridge
  • Hauling and splicing